The batteries have arrived for the Tuvalu and Northern Cook Island project. Currently down on the wharf at the Port of Tauranga pellet load after pellet load of batteries are being sorted and labelled before being shipped to the islands. We have aluminium framing arriving too and later this month the solar panels.